2011
Goldwave Steel Structure Engineering Ltd. was founded
2017
Establishment of Shenzhen Factory (Goldwave Steel Structure Engineering (Shenzhen) Co. Ltd.)
2017
1st Structural Steel High Rise Building construction commenced (H-Code, Pottinger Street, Central)
2018
Acquisition of Ngau Kee Steel Engineering Limited (Goldwave In-house Steel Structure Installation Specialist Company established)
2019
Establishment of Jiangmen Factory equipment with Marine access facilities (Goldwave Steel Structure (Jiangmen) Co. Ltd.)
2019
Welding automated fabrication lines started in operation
2020
In-house Heavy Lifting Division established
2020
Robotic welding arms operated at Kwong Wah Hospital Redevelopment Project
2020
Fabrication line for wind turbine monopolies started in operation
2020
Fabrication for Australia Neville Bonner Bridge components (Deck length of 331 meters) exported to Australia
2021
Way Forward R&D investment on Heavy Lifting Equipment and Methodology Investment on Modular Welding System for on-site welding